Wednesday, 25 February 2015

Test Flight 7 February 2015

Engine runs at the hangar  have  yielded  data that  has allowed Ron to reduce the radiator size for  cooling both oil and water . In addition the electrical relays relative to the engine control unit have been reinvented and made redundant in order to ensure that engine will run and run. All this work was tested successfully on this 30 minute flight on a farm in Herradura, Costa Rica .